⟩ How to measures delivered defect quantities for the Product?
Normalized per function point (or per LOC)
At product delivery (first 3 months or first year of operation)
Ongoing (per year of operation)
By level of severity
By category or cause, e.g.: requirements defect, design defect, code defect, documentation/on-line help defect, defect introduced by fixes, etc.