⟩ What do you feel is the most important skill an asbestos worker should possess?
Specially you know what you doing is very dangerous, if any mistake its your fault but none else. You.
Specially you know what you doing is very dangerous, if any mistake its your fault but none else. You.
What is project management software?
The height of the sink of wash basin above floor level is kept A. 60 cm B. 70 cm C. 75 cm to 80 cm D. 80 cm
Explain me why are manhole covers round?
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and A. breadth of the wall B. half breadth of wall on each side C. one fourth breadth of wall on each side D. None of these.
Pick up the correct statement from the following A. The bent up bars at a support resist the negative bending moment B. The bent up bars at a support resist the sharing force C. The bending of bars near supports is generally at 45° D. All the above.
Pick up the excavation where measurements are made in square metres for payment. A. Ordinary cuttings up to 1 m B. surface dressing up to 15 cm depths C. Surface excavation up to 30 cm depths D. Both (b) and (c) E. Both (a) and (b)
While preparing a detailed estimate A. Dimension should be measured correct to 0.01 m B. Area should be measured correct to 0.01 sqm C. Volume should be measured correct to O.Olcum D. All the above.
The expected out turn of 2.5 cm cement concrete floor per manson per day A. 2.5 sqm B. 5.0 sqm C. 7.5 sqm D. 10 sqm
Pick up the correct statement in case of water supply. A. Pipes laid in trenches and pipes fixed to walls are measured separately B. Cutting through walls and floors are included with the item C. Pipes are classified according to their sizes and quality D. In laying pipes, the method of jointing and fixing is specifically specified E. All the above.
Behavioral Estimator interview questions