Pick up the excavation where measurements are made in square metres for payment. A. Ordinary cuttings up to 1 m B. surface dressing up to 15 cm depths C. Surface excavation up to 30 cm depths D. Both (b) and (c) E. Both (a) and (b)
While preparing a detailed estimate A. Dimension should be measured correct to 0.01 m B. Area should be measured correct to 0.01 sqm C. Volume should be measured correct to O.Olcum D. All the above.
The expected out turn of 2.5 cm cement concrete floor per manson per day A. 2.5 sqm B. 5.0 sqm C. 7.5 sqm D. 10 sqm
Pick up the correct statement in case of water supply. A. Pipes laid in trenches and pipes fixed to walls are measured separately B. Cutting through walls and floors are included with the item C. Pipes are classified according to their sizes and quality D. In laying pipes, the method of jointing and fixing is specifically specified E. All the above.
Behavioral Estimator interview questions
Operational and Situational Estimator Job Interview Questions
Behavioral Estimator Job Interview Questions
Basic Estimator Job Interview Questions
Competency Based Estimator interview questions
Situational Estimator interview questions