Answers

Question and Answer:

  Home  Pre-Engineering

⟩ Basic Pre-Engineering Job Interview Questions

โ˜› What is rigging?

โ˜› What are the techniques to measure road difference?

โ˜› Explain major differences between routing maintenance and major maintenance.

โ˜› What you understand by Richter scale?

โ˜› How do we calculate the power of centrifugal pump?

โ˜› What is a tensile strength? What is the tensile strength of wood?

โ˜› Difference between pre-tensioning and post-tensioning.

โ˜› Explain the difference between shear and tensile strength.

โ˜› Why the statue of liberty is made of Copper?

โ˜› What is the difference between TOR steel and TMT steel?

โ˜› Which code is used for TOR & TMT steel bar?

โ˜› Explain major difference between auto level and dumpy level?

โ˜› What is the L/D ratio of cantilever beam?

โ˜› What is the ratio of steel and concrete to use in slabs , beams, columns ?

โ˜› What is pre-stressed concrete?

โ˜› What are the ingredients of pre-stressed concrete?

โ˜› What do you mean by honeycomb in concrete?

โ˜› Why is concrete cube test carried out?

โ˜› How do you calculate the power of centrifugal pump?

โ˜› What is aggregate?

โ˜› What is absolute pressure? How absolute pressure is calculated?

โ˜› What is the absolute pressure scale?

โ˜› What is gravity flow?

โ˜› What is a projection line?

โ˜› What is horizon or horizontal mining?

 133 views

More Questions for you: