⟩ How the data flow in fico-pp integration?
For FICO - Production planning the integration is mainly in
controlling area - Primary cost element , secondary cost
element , activity cost and cost centre .
PP-FICO inteegartion
A.
1. Activity type you have to define in PP area , thse
activity handover to FI consultant.
2. FI consultant assign prizing to this activity ,
3. Then you assign this activity in your workcenter
4. Assign cost center in work center , take this cost
center from FI
===> From this plaaned cost calculate , formula from work
center, values from routings and prize from FI , flow
completed.
B.
1. Define valuation varrient in order type dependent
parameter i.e opl8 in controlling tab page.- SPRO
2. take this valuation varrient from FI
3. Discuus the REL strategy with FI during costing sheet
preaparation with FI
4. Take controlling area from FI
5. Costing varrient , varriance key in order type SPRO
6. Settelement profile
7. Disccus when FI want to calculate actual cost at REl ,
8. If the process is REM- then product cost collector -
KKF6N for your proper production version
9. In REM process - product costing CK11N and CK24 monthly.
10.Actual varrient 007 and planned varrient from costing
sheet.
11. In control key configurataion costing check box- OP67