Answers

Question and Answer:

  Home  Material Cost

⟩ What is Re-order level?

This level is fixed between maximum and minimum level in such a way that the requirement of materials for the production can be met properly till the fresh supply of material is received. This level of material stock indicates that steps should be taken for procurement of further lots of material.

 134 views

More Questions for you: