⟩ How do you decide on the technology which is to be used to execute a particular project?
by making effective communication with customer,we find out
the exact problem defination.
by making effective communication with customer,we find out
the exact problem defination.
A construction schedule is prepared after collecting A. number of operations B. output of labor C. output of machinery D. quantity of various items E. all the above
CPM is A. synthesizing in concepts B. is built of activities oriented program C. is based on time estimate D. is used for repetitive works E. all the above
Construction team means A. an engineer B. an architect C. an owner D. a contractor E. all the above
Critical path lies along the activities having total float A. positive B. negative C. zero D. same
The performance of a specific task in CPM, is known A. Dummy B. Event C. Activity D. Contract
Final technical authority of a project lies with A. Assistant Engineer B. Executive Engineer C. Superintending Engineer D. Chief Engineer
Bar charts are suitable for A. minor works B. major works C. large projects D. all the Above
Works costing less than Rs. 20,000 are treated as A. projects B. major projects C. minor projects D. all the above
If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be A. started 5 days later B. completed 5 days later C. performed at slower rate in 15 days D. all the above
Pick up the correct statement from the following A. CPM analysis is activity oriented B. PERT analysis is event oriented C. CPM does not make any allowance for the uncertainties in the duration of time D. In CPM, the time is related to cost E. All the above