Pick up the incorrect statement from the following A. The activity is the time consuming part of a project B. The beginning and end of a job, are called events C. The activity which consumes maximum time, is called a node D. Logically and sequentially connected activities and events form a network E. None of these
Military organisation is known as A. line organisation B. line and staff organisation C. functional organisation D. none of these
Completion of an activity on CPM network diagram, is generally known A. Event B. Node C. Connector D. All the above.
Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following A 1. Pouring of Concrete 2. Erection of form work 3. Curing of concrete 4. Removal of form work B 1. Erection of form work 2. Pouring of concrete 3. Curing of concrete 4. Removal of form work C 1. Removal of form work 2. Erection of form work 3. Pouring of concrete 4. Curing of concrete D 1. Pouring of concrete 2. Curing of concrete 3. Erection of form work 4. Removal of form work
A dummy activity A. is artificially introduced B. is represented by a dotted line C. does not consume time D. all the above
A Milestone chart A. shows the inter-dependencies of various jobs B. depicts the delay of jobs, if any C. points outgoing ahead of schedule of jobs, if any D. none of these.
A lock-box service is used for A. depositing cash when bank is closed B. paying bank customer bills automatically C. storing papers in a bank vault D. depositing payments to bank customers E. None of the above
Inventory is also referred to as A. stock B. warehouse capacity C. materials D. materials in hand E. None of the above
Controls of data communication deal with A. the communication channel B. the computer C. terminals D. All of the above E. None of the above
Pick up the correct statement from the following A. The float may be positive, zero or negative B. If the float is positive and the activity is delayed by a period equal to its total float, the completion of project is not delayed C. If the float of an activity is negative, delay in its performance is bound to delay the completion of project D. If the float of an activity is zero, the activity is critical and any delay in its performance will delay the whole project E. All the above.