Pick up the correct statement from the following A. The float may be positive, zero or negative B. If the float is positive and the activity is delayed by a period equal to its total float, the completion of project is not delayed C. If the float of an activity is negative, delay in its performance is bound to delay the completion of project D. If the float of an activity is zero, the activity is critical and any delay in its performance will delay the whole project E. All the above.
The difference between the time avail-to do a job and the time required to do the job, is known as A. event B. float C. duration D. constraint
The operations file is updated by the A. production control system B. MRP system C. shipping system D. All of the above E. None of the above
Time and progress chart of a construction, is also known as A. Bar chart B. Gantt chart C. Modified Mile stone chart D. Critical path method chart E. All the above
Which one of the following represents an activity A. excavation for foundation B. curing of concrete C. setting of question paper D. preparation of breakfast E. all the above
The technique for establishing and maintaining priorities among the various jobs of a project, is known A. Event flow scheduling technique B. Critical ratio scheduling C. Slotting technique for scheduling D. Short interval scheduling
Mile Stone charts were invented in the year of A. 1910 B. 1920 C. 1930 D. 1940 E. 1950
A critical ratio scheduling A. establishes the relative priorities among various activities on a common basis B. determines the status of each activity C. adjusts automatically changes in activity progress D. is a dynamic system E. none of these
Pick up the incorrect statement from the following A. An activity of a project is denoted by an arrow on the net work B. The tail of the arrow indicates the start of the activity C. The head of the arrow indicates the end of the activity D. The arrows are drawn to scale from left to right E. Each activity consumes a given time
_____ means that the manager spends his or her time dealing with exceptions or those situations which are out of control. A. relevant B. management by exception C. predictive reports D. control E. None of the above