⟩ What is OSP cycle?

Osp cycle is only carrying out to incur the cost value in

wip summary report,osp is usually doing only for each

job,osp is generally mapping at wip operations level,once u

r operations comming for osp know, that time

automatically/manually we have to creat purchase req,and

press the outside processing button at the footer

level,then it is asking for u r desctete job number,and go

ahead to creat the pur req for that osp,then receive the

osp item directly to shop floor,and the a/c is

automatically in wip summary and in GL a/c.