Quality Assurance

  Home  Quality Assurance  Quality Assurance


“Inspector Quality Assurance/QC based Frequently Asked Questions by expert members with experience as Inspector QA/QC. These questions and answers will help you strengthen your technical skills, prepare for the new job test and quickly revise the concepts”



113 Quality Assurance Questions And Answers

21⟩ Informational Basic Quality Control Inspector interview questions

☛ What have you gained from your Quality Control Inspector work experiences?

☛ What is the most recent skill you have learned that related to Quality Control Inspector?

☛ What is the difference between a manager and a leader?

☛ What was your major disappointment?

☛ Have you handled a difficult situation with a co-worker? How?

☛ What are your salary increases?

☛ Do you work better under pressure or with time to plan and organize?

 220 views

22⟩ Face to Face Quality Control Inspector interview questions

☛ What was the most stressful situation you have facedas as Quality Control Inspector?

☛ What do you ultimately want to become?

☛ Tell me about a time when you successfully handled a situation?

☛ What was your best learning experience?

☛ What negative thing would your last boss say about you?

☛ Describe a situation when you had to convince others.

☛ What do people most often criticize about you?

 180 views

23⟩ First Quality Control Inspector interview questions

☛ How much preparation on files for trial do you do?

☛ How many Quality Control Inspector projects do you work on at once?

☛ Tell about a time that you had to adapt to a difficult situation.

☛ What do you think, would you be willing to travel for work?

☛ Do you have the qualities and skills necessary to Quality Control Inspector?

☛ Who was your favorite manager and why?

☛ Has anything ever irritated you about people you've worked with?

 199 views

24⟩ General Quality Control Inspector interview questions

☛ Do you know anyone who works as Quality Control Inspector at this company?

☛ What do you think you can bring to this Quality Control Inspector position?

☛ Give an example of how you set goals and achieve them.

☛ What do you consider your most significant strength?

☛ What do you think of your previous boss?

☛ What is the toughest group that you have had to get cooperation from?

☛ What did you do to prepare for this job interview?

 183 views

25⟩ Basic Quality Control Inspector interview questions

☛ What is the most enjoyable part of Quality Control Inspector job?

☛ What features of your previous jobs have you disliked?

☛ Give an example of when you had to present complex information in a simplified manner.

☛ Have you had to convince a team to work on a project they weren't thrilled about?

☛ What do you think of your previous boss?

☛ How do you keep each member of the team involved and motivated?

☛ How do you maintain a positive discussion?

The response to this question usually reveals if the candidate has personal or professional goals. The interviewer is trying to see how well you would fit in to the position. During the Quality Control Inspector interview, detailing how you work with others is important.

 190 views

26⟩ Do you know what is Test case?

Test case is a specific term that is used to test a specific element. It has information of test steps, prerequisites, test environment and outputs.

 172 views

27⟩ Explain what are the five common solutions for software developments problems?

☛ Setting up the requirements criteria, the requirements of a software should be complete, clear and agreed by all

☛ The next thing is the realistic schedule like time for planning , designing, testing, fixing bugs and re-testing

☛ Adequate testing, start the testing immediately after one or more modules development.

☛ Use rapid prototype during design phase so that it can be easy for customers to find what to expect

☛ Use of group communication tools

 168 views

28⟩ Tell me the software quality practices through the software development cycle?

Software quality practices includes

☛ Review the requirements before starting the development phase

☛ Code Review

☛ Write comprehensive test cases

☛ Session based testing

☛ Risk based testing

☛ Prioritize bug based on usage

☛ Form a dedicated security and performance testing team

☛ Run a regression cycle

☛ Perform sanity tests on production

☛ Simulate customer accounts on production

☛ Include software QA Test Reports

 189 views

29⟩ Explain what are general work procedure (WP)?

The. general sequence of activities will be as follows;

☛ Receiving Drawing and documents.

☛ Reproduction of Drawing

☛ Issuing of Drawing to site

☛ New issuing New revision

☛ Shredding of Drawings

☛ Redlining Drawings

☛ Transmittal of redlines to client (As-built).

 178 views

30⟩ Explain what are the required documents for an inspection?

Following are the required documents for an inspection;

☛ RFI (Request for inspection)

☛ P&ID for line verification

☛ PP for location (pipe plan)

☛ Wiring diagram for wiring details

☛ Data sheet for calibration and pressure test

☛ Hook-up etc. for remote tubing/air line

☛ QR for maintaining record

☛ WP, work procedure, to check each and every steps as per spec.

☛ QCO for issuing in case of little violation

☛ NCR, for issuing in case of major violation etc.

 212 views

31⟩ Explain the different types of software testing?

☛ Unit testing

☛ Integration testing and regression testing

☛ Shakeout testing

☛ Smoke testing

☛ Functional testing

☛ Performance testing

☛ White box and Black box testing

☛ Alpha and Beta testing

☛ Load testing and stress testing

☛ System testing

 184 views

32⟩ Explain what are the types of documents in QA?

The types of documents in QA are

☛ Requirement Document

☛ Test Metrics

☛ Test cases and Test plan

☛ Task distribution flow chart

☛ Transaction Mix

☛ User profiles

☛ Test log

☛ User profiles

☛ Test incident report

☛ Test summary report

 175 views

35⟩ Explain the abilities you have in order to work with us as quality control systems manager?

I have the ability to tell when something is wrong or is likely to go wrong. It does not involve solving the problem, only recognizing there is a problem, communicate information and ideas in speaking so others will understand, read and understand information and ideas presented in writing, listen to and understand information and ideas presented through spoken words and sentences, apply general rules to specific problems to produce answers that make sense.

 181 views

39⟩ Tell me what are the required documents for a remote loop folder?

Following are the required documents for a remote loop folder:

☛ Loop package check list

☛ ILD (instrument loop diagrams)

☛ Instrument loop acceptance records(TR/test record)

☛ P&ID (piping & instrument Diagram)

☛ ISS/IDS(instrument specification sheet/instrument data sheet)

☛ Alarm List

☛ Calibration record (TR)

☛ Cable megger report (primary prior to pulling)

☛ Cable megger report (secondary after pulling)

☛ Pressure test record(TR)

☛ MC check record (remote loop)(green color)

☛ MC punch list, Loop check punch list etc.

 167 views

40⟩ Explain what is Quality Assurance?

Quality Assurance is known as QA and focuses on preventing defect. Quality Assurance ensures that the approaches, techniques, methods and processes are designed for the projects are implemented correctly. Quality assurance activities monitor and verify that the processes used to manage and create the deliverables have been followed and are operative.

Quality Assurance is a proactive process and is Prevention in nature. It recognizes flaws in the process. Quality Assurance has to complete before Quality Control.

 184 views