Answers

Question and Answer:

  Home  Electrical Engineering

⟩ Prior to using an electric saw on a construction site, a user check finds that the insulation on the supply flex is damaged. The correct procedure would be to

* a) Replace the cord with a new one

* b) Report the damage to a supervisor after use

* c) Repair the cord with insulation tape

* d) Report the damage to a supervisor before use

Answer – d

 180 views

More Questions for you: