21⟩ Milestone chart A. shows the interdependencies of various jobs B. depicts the delay of jobs, if any C. points outgoing ahead of schedule of jobs, if any D. none of these
D. none of these
“Manager Construction Frequently Asked Questions in various Construction Manager job Interviews by interviewer. The set of questions here ensures that you offer a perfect answer posed to you. So get preparation for your new job hunting”
D. none of these
D. Chief Engineer
C. minor projects
B. slow time
E. All the above
E. all the above
B. Engineer
E. All the above
B. horizontal lines
D. all the above.
C. The activity which consumes maximum time, is called a node
D. all the above
C. Activity
E. all the above
B. 1900
D. all the above
D. all the above
E. All the above
D. The arrows are drawn to scale from left to right
C. dummy