Software Quality Assurance Engineer

  Home  Other Professions  Software Quality Assurance Engineer


“SQA Engineer post Frequently Asked Questions in various Software Quality Assurance Engineer job Interviews by interviewer. The set of questions here ensures that you offer a perfect answer posed to you. So get preparation for your new job hunting”



48 Software Quality Assurance Engineer Questions And Answers

41⟩ Which Software Quality Control Nomenclature is implemented for a software product?

Software Quality Control Nomenclature:

- Verifying: comparing the code predictions

- Validating: Comparing the prediction of code with test data

- Version Testing: Comparing output of the current version with output of the previous version

- Installation Testing: Comparing the result with newly installed code to the sample result code

- Development Code: Code tested only by the software developer.

- Alpha Code: Testing of the software product internally by selected users.

- Beta Code: Code testing internally by a large numbers of users.

- Released Code: Well tested and documented code that is officially distributed.

 191 views

42⟩ Lis the Software Control Methods?

A paradigm that is Goal Question centric.

- A method that control the overall risk.

- Quality Control that involves Plan, Perform, Check, Action Model.

- Complete Software Quality Control.

- Software Development Method that involve the Spiral Model.

 170 views

43⟩ Explain about Quality Control?

Includes the activities that are designed to determine the level of quality.

- QC is a reactive means which measures and monitors the quality

- Includes operational activities and techniques to meet the quality needs.

- QC involves in verifying the desired quality levels.

 185 views

44⟩ Explain Software Functional Size?

The very common function size is Function Point Analysis.

- FPA is all about measuring the software deliverables.

- FPA is based on the requirements of the user and presents accurate representation of developer and estimator.

- FPA reflects the functionality that is delivered to the client.

- FPA involves in identifying and weighting of inputs, outputs and data storage.

 165 views

45⟩ What are the changes in a company when it receives ISO 9001 certification?

Quality being part of every day operations, is the internal impact.

- Quality becomes as a part of setting and managing the objectives, practices.

- The open up of operations to customer audits, is the external impact.

- Procedures and record-keeping improve dramatically.

- The implementation of this standards will obviously takes the work to keep audits and the appropriate follow-ups fluent.

 187 views

46⟩ What are the Project Control Activities?

The following are the activities of project control:

- Verify the integrity of the database files.

- Check the transcription errors while inputting and referencing the data.

- Verify the data consistency.

- Perform the internal review of documents.

- Perform the completeness check.

- Compare the existing results with previous results.

 169 views

47⟩ When do we use a c-chart?

Control charts are suitable for tracking items such as:

Production failures

Defects by life cycle phase

Complaint/failures by application/software

Response time to change request

Cycle times/delivery times

Mean time to failure

 180 views