Answers

Question and Answer:

  Home  Actuate

⟩ How to implement the parallel report?

This is quite simple to implement.

If you have the example which are there in the actuate

install folder you can get help from it.

For developing this what you can do is put a parallel

section first and then drag those 2 reports on it, then

design those report and in the page layout use two flows

and in the report properties assign the flows to the

respective reports.

this way you can design it

 138 views

More Questions for you: