⟩ How do you prioritize the tasks to be completed in one complete work project?
Answer should show that applicant knows how to plan ahead, make good decisions, analyze different possibilities, and effectively accomplish the maximum workload.
Answer should show that applicant knows how to plan ahead, make good decisions, analyze different possibilities, and effectively accomplish the maximum workload.
Tell me what instructions would you give your staff if you decided to delegate?
Define what steps you take to ensure that the work you delegate is successful?
The Military organisation is known as A. line organisation B. line and staff organisation C. functional organisation D. none of these
Construction team means A. an engineer B. an architect C. an owner D. a contractor E. all the abov
CPM is a A. synthesizing in concepts B. is built of activities oriented program C. is based on time estimate D. is used for repetitive works E. all the above
The Final technical authority of a project lies with A. Assistant Engineer B. Executive Engineer C. Superintending Engineer D. Chief Engineer
Performance of a specific task in CPM, is known A. Dummy B. Event C. Activity D. Contract
Construction schedule is prepared after collecting A. number of operations B. output of labor C. output of machinery D. quantity of various items E. all the above
Pick up incorrect statement from the following A. The activity is the time consuming part of a project B. The beginning and end of a job, are called events C. The activity which consumes maximum time, is called a node D. Logically and sequentially connected activities and events form a network E. None of these
Dummy activity A. is artificially introduced B. is represented by a dotted line C. does not consume time D. all the above